Sandblasting
The plant features a shot blasting chamber measuring 30 m x 8 m x 5.8 m (h), offering an extremely large operating volume; these dimensions allow for the processing of heavy metalwork and non-standard industrial components.
Process efficiency is ensured by specific components:
Automated Partial Recovery System
Double Sandblaster
HMI Interface: A color touchscreen operator panel centralizes parameter settings (pressure, abrasive flow) and alarm diagnostics, improving process safety and repeatability.
Integration with the warehouse infrastructure is ensured by:
Pneumatic Upper Door: An automated opening on the roof that allows for zenithal loading.
Lifting Capacity: Two 25-ton overhead cranes facilitate precise positioning of parts within the chamber.
Current news
INSTALLATION OF 2 CRANKS OF 50 TON
Although 2020 has reserved unexpected events for us, the enthusiasm and passion for our work has not …
Construction of new warehouses operational from the beginning of 2026
Expansion of production departments and offices/services by 3000 m2 covered with installation of 6 …
NEW SANDBLASTING PLANT TO START OPERATION IN 2026
…